Brown-Kopel Engineering Student Achievement Center


Brown-Kopel Engineering Student Achievement Center
Brown-Kopel Engineering Student Achievement Center

Brown-Kopel Engineering Student Achievement Center


Project Overview:
The Brown-Kopel Engineering Student Achievement Center project will construct a three-story building consisting of classrooms, student study spaces, maker space, a wind-tunnel laboratory, meeting and departmental spaces for academic advising, tutoring, professional development and industrial relations. The Student Achievement Center will connect to the Gavin Engineering Research Laboratory building with a single story courtyard structure at the ground and first floors. This below-grade courtyard space will be "shelled out" and used for future College of Engineering laboratory and shop space expansion.

Client:
College Of Engineering - Samuel Ginn

Timeline:



Construction Period
Fall 2017 - Summer 2019

Board Approved Budget
$44 M

Square Footage
102,400

Primary Use
ACADEMIC